1. Home
  2. Projects

Moscow

SKY HOUSE: MEP systems and common-area finishing

Power, low-voltage systems, ventilation and common-area finishing at SKY HOUSE in Moscow: four towers up to 98.5 m tall, an office building and 539 apartments.

  • Design & BIM
  • HVAC
  • Power supply
  • Low-voltage systems
Towers of the SKY HOUSE residential complex

The project in numbers

over 110 kmof power cable lines
over 150 kmof low-voltage networks
over 15,000 m²of ductwork
over 19,000 m²of common-area finishing

Approximate scope of works on the complex

SKY HOUSE is a residential complex in Moscow's Yakimanka district, a few minutes' walk from Shabolovskaya and Oktyabrskaya metro stations: four towers up to 98.5 m tall, an office building and 539 apartments. Our team prepared the working documentation, installed the building services (power, low-voltage systems, ventilation and heating) and carried out general construction works in the common areas.

Our scope

  • Working documentation for the building services, coordinated in a BIM model.
  • Power and lighting: feeders, risers, floor and apartment panels, circuits for the office building.
  • Low-voltage systems: fire alarm and voice evacuation, access control, CCTV, door entry, structured cabling and TV, building monitoring.
  • Ventilation, smoke control, heating and heat substations.
  • General construction and finishing in the lobbies, lift halls, corridors and stairwells.

Systems

Power supply

About 110 km of cable lines, from the main switchboards and tower risers to the circuits of the common areas and the office building. About 750 panels, including floor and apartment panels, and about 4,000 luminaires.

Equipment: ng(A)-LS and ng(A)-FRLS cables, distribution, floor and apartment panels

Low-voltage systems

About 150 km of low-voltage networks and about 5,800 fire detectors, more than 1,300 of them in a single tower. Add about 250 CCTV cameras, access control, door entry and monitoring of the building services.

Equipment: Rubezh R3 addressable system, KPSng(A)-FRHF fire-resistant cables

Ventilation and climate

About 15,000 m² of ductwork and about 70 general ventilation and smoke control systems for the residential towers and the office building. About 30 km of heating and heat supply pipework, plus heat substations.

Equipment: air handling units, smoke extract and pressurisation fans, heat substations

Common areas

About 19,000 m² of entrance lobbies, lift halls, corridors and stairwells: porcelain floors, wall finishes, suspended ceilings and doors.

Materials: porcelain stoneware, plasterboard, suspended ceilings

How the work went

  1. The model before the site. We prepared the working documentation for the building services and coordinated it in a BIM model, resolving clashes on screen rather than on site.
  2. The mains. We laid the main cable routes and ventilation mains and installed the heat substations, the backbone from which the systems branch out into the towers.
  3. Up the towers. Floor by floor we raised the power and low-voltage risers, set the floor panels and installed smoke control for the lift halls and stairs, to a height of almost 100 metres.
  4. The face of the building. We finished the entrance lobbies, lift halls and corridors and installed the ceilings and lighting that residents see every day.
  5. Commissioning and handover. We commissioned the systems and handed the buildings over one after another, up to the last house of the complex.

What made the project special

  • High-rise towers. Two towers with 28 residential floors and two with 21: risers, smoke control and lifting materials to great heights.
  • A mixed-use complex. Housing, an office building and sports facilities, each zone with its own engineering requirements.
  • Completing a stalled project. Construction began in 2008, and the complex was finished under a new technical customer, Capital Group. The building services were brought to handover building by building.
  • BIM. Works and delivery schedules were synchronised with the BIM model, so rework was kept to a minimum.

Interesting facts

  • In 2019 Capital Group took over completion of the complex as technical customer.
  • The buildings were commissioned in phases; the last house of the complex was handed over on 29 December 2022.
  • Apartments have 3.2 m ceilings, and every house has three high-speed lifts.
  • Apartments in the complex range from 54 to 183 m².