Moscow, Kapotnya
Moscow Oil Refinery: electrical installation and lighting
Electrical works at the operating Moscow Oil Refinery: power and lighting for a new administrative complex, 53 km of cable lines and heavy cable on an overpass.
- Power supply

The project in numbers
The scope of our works on the project
Gazprom Neft's Moscow Oil Refinery in Kapotnya covers more than a third of the capital region's demand for motor fuel, including the Moscow airports. Since 2011 the refinery has been undergoing a large-scale modernisation. Our team carried out electrical works at the operating plant: in a new administrative and amenity complex and at the refinery's energy facilities.
Our scope
- Power supply and power circuits of the new administrative and amenity complex.
- Indoor and outdoor lighting of the complex.
- Connection of smoke control dampers to the control system.
- Power and control cable lines for the refinery's heat and power facilities.
- 0.4 kV panels, cable supports and trays.
- Earthing.
Systems
Administrative and amenity complex
A new building with an office block and an amenity block. About 1,425 luminaires mounted at about 4 m, 350 sockets and 245 switches, cable lines from the panels, and outdoor lighting on composite poles.
Equipment: halogen-free and fire-resistant PPGng(A)-HF and FRHF cables, cable trays
Smoke control automation
Connection of fire and smoke dampers through 16 relay units, with about 440 m of cable.
Equipment: Bolid S2000-SP4/220
Refinery energy facilities
Armoured power cable and control cable for the heat and power complex, including about 1.9 km of 5×240 mm² cable on a live cable overpass at a height of 8–11 m. Six 0.4 kV panels, about 1,200 cable shelves and posts, 32 cable terminations and sealed cable entries into hazardous-area rooms.
Equipment: VBbShvng(A)-LS and KVVGng(A)-LS cables, KVT terminations, Layher scaffolding
How the work went
- Clearance for the refinery. In May 2025 the crew passed industrial safety tests and received passes to the operating plant.
- The new administrative complex. We laid cable lines and installed lighting in the new building, more than 1,400 luminaires.
- Heavy cable above the plant. We pulled 5×240 mm² power cable along a live overpass at 8–11 m, from an aerial platform and scaffolding, over rollers and with a winch.
- Panels and connections. We installed the 0.4 kV panels, terminated the cables and connected the equipment.
What made the project special
- An operating refinery. Work on the site of a running plant under permits to work, with gas detectors and respiratory protection.
- Heavy cable at height. One metre of 5×240 cable weighs about 15 kg. It was winched over rollers at 8–11 m.
- Engineering judgement. We calculated the extra load on the old overpass and had it strengthened before the cable was pulled.
- Industrial safety. Staff certification, permits for work at height and hot work, method statements.
Interesting facts
- The refinery processed its first tonne of crude on 1 April 1938, which is considered its birthday.
- In 1941 a plywood double of the refinery was built a few kilometres away to deceive enemy aircraft.
- The Euro+ complex, launched in 2020, replaced five 1960s units and provides half of the refinery's capacity.
- The Biosphere treatment facilities clean wastewater to 99.9% and cut water intake from the Moskva River by 2.5–3 times.